mirror of
https://github.com/AuxXxilium/linux_dsm_epyc7002.git
synced 2024-12-24 09:22:52 +07:00
7ceb2afbd6
When using switchdev deferred operation (SWITCHDEV_F_DEFER), the operation is executed in different context and the application doesn't have any way to get the operation real status. Adding a completion callback fixes that. This patch adds fields to switchdev_attr and switchdev_obj "complete_priv" field which is used by the "complete" callback. Application can set a complete function which will be called once the operation executed. Signed-off-by: Elad Raz <eladr@mellanox.com> Signed-off-by: Jiri Pirko <jiri@mellanox.com> Reviewed-by: Ido Schimmel <idosch@mellanox.com> Acked-by: Nikolay Aleksandrov <nikolay@cumulusnetworks.com> Signed-off-by: David S. Miller <davem@davemloft.net> |
||
---|---|---|
.. | ||
Kconfig | ||
Makefile | ||
switchdev.c |