Commit Graph

10 Commits

Author SHA1 Message Date
Dario Faggioli
712e5e34ae sched/deadline: Add sched_dl documentation
Add in Documentation/scheduler/ some hints about the design
choices, the usage and the future possible developments of the
sched_dl scheduling class and of the SCHED_DEADLINE policy.

Reviewed-by: Henrik Austad <henrik@austad.us>
Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
[ Re-wrote sections 2 and 3. ]
Signed-off-by: Luca Abeni <luca.abeni@unitn.it>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1390821615-23247-1-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-28 13:08:40 +01:00
Juri Lelli
71362650b5 sched/deadline: No need to check p if dl_se is valid
Dan Carpenter reported new 'Smatch' warnings:

  > tree:   git://git.kernel.org/pub/scm/linux/kernel/git/tip/tip.git sched/core
  > head:   130816ce4d
  > commit: 1baca4ce16 [17/50] sched/deadline: Add SCHED_DEADLINE SMP-related data structures & logic
  >
  > kernel/sched/deadline.c:937 pick_next_task_dl() warn: variable dereferenced before check 'p' (see line 934)

BUG_ON() already fires if pick_next_dl_entity() doesn't return a valid
dl_se. No need to check if p is valid afterward.

Reported-by: Dan Carpenter <dan.carpenter@oracle.com>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Fixes: 1baca4ce16 ("sched/deadline: Add SCHED_DEADLINE SMP-related data structures & logic")
Link: http://lkml.kernel.org/r/52D54E25.6060100@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-16 09:27:11 +01:00
Peter Zijlstra
1724813d9f sched/deadline: Remove the sysctl_sched_dl knobs
Remove the deadline specific sysctls for now. The problem with them is
that the interaction with the exisiting rt knobs is nearly impossible
to get right.

The current (as per before this patch) situation is that the rt and dl
bandwidth is completely separate and we enforce rt+dl < 100%. This is
undesirable because this means that the rt default of 95% leaves us
hardly any room, even though dl tasks are saver than rt tasks.

Another proposed solution was (a discarted patch) to have the dl
bandwidth be a fraction of the rt bandwidth. This is highly
confusing imo.

Furthermore neither proposal is consistent with the situation we
actually want; which is rt tasks ran from a dl server. In which case
the rt bandwidth is a direct subset of dl.

So whichever way we go, the introduction of dl controls at this point
is painful. Therefore remove them and instead share the rt budget.

This means that for now the rt knobs are used for dl admission control
and the dl runtime is accounted against the rt runtime. I realise that
this isn't entirely desirable either; but whatever we do we appear to
need to change the interface later, so better have a small interface
for now.

Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/n/tip-zpyqbqds1r0vyxtxza1e7rdc@git.kernel.org
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:47:23 +01:00
Juri Lelli
6bfd6d72f5 sched/deadline: speed up SCHED_DEADLINE pushes with a push-heap
Data from tests confirmed that the original active load balancing
logic didn't scale neither in the number of CPU nor in the number of
tasks (as sched_rt does).

Here we provide a global data structure to keep track of deadlines
of the running tasks in the system. The structure is composed by
a bitmask showing the free CPUs and a max-heap, needed when the system
is heavily loaded.

The implementation and concurrent access scheme are kept simple by
design. However, our measurements show that we can compete with sched_rt
on large multi-CPUs machines [1].

Only the push path is addressed, the extension to use this structure
also for pull decisions is straightforward. However, we are currently
evaluating different (in order to decrease/avoid contention) data
structures to solve possibly both problems. We are also going to re-run
tests considering recent changes inside cpupri [2].

 [1] http://retis.sssup.it/~jlelli/papers/Ospert11Lelli.pdf
 [2] http://www.spinics.net/lists/linux-rt-users/msg06778.html

Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-14-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:46:46 +01:00
Dario Faggioli
332ac17ef5 sched/deadline: Add bandwidth management for SCHED_DEADLINE tasks
In order of deadline scheduling to be effective and useful, it is
important that some method of having the allocation of the available
CPU bandwidth to tasks and task groups under control.
This is usually called "admission control" and if it is not performed
at all, no guarantee can be given on the actual scheduling of the
-deadline tasks.

Since when RT-throttling has been introduced each task group have a
bandwidth associated to itself, calculated as a certain amount of
runtime over a period. Moreover, to make it possible to manipulate
such bandwidth, readable/writable controls have been added to both
procfs (for system wide settings) and cgroupfs (for per-group
settings).

Therefore, the same interface is being used for controlling the
bandwidth distrubution to -deadline tasks and task groups, i.e.,
new controls but with similar names, equivalent meaning and with
the same usage paradigm are added.

However, more discussion is needed in order to figure out how
we want to manage SCHED_DEADLINE bandwidth at the task group level.
Therefore, this patch adds a less sophisticated, but actually
very sensible, mechanism to ensure that a certain utilization
cap is not overcome per each root_domain (the single rq for !SMP
configurations).

Another main difference between deadline bandwidth management and
RT-throttling is that -deadline tasks have bandwidth on their own
(while -rt ones doesn't!), and thus we don't need an higher level
throttling mechanism to enforce the desired bandwidth.

This patch, therefore:

 - adds system wide deadline bandwidth management by means of:
    * /proc/sys/kernel/sched_dl_runtime_us,
    * /proc/sys/kernel/sched_dl_period_us,
   that determine (i.e., runtime / period) the total bandwidth
   available on each CPU of each root_domain for -deadline tasks;

 - couples the RT and deadline bandwidth management, i.e., enforces
   that the sum of how much bandwidth is being devoted to -rt
   -deadline tasks to stay below 100%.

This means that, for a root_domain comprising M CPUs, -deadline tasks
can be created until the sum of their bandwidths stay below:

    M * (sched_dl_runtime_us / sched_dl_period_us)

It is also possible to disable this bandwidth management logic, and
be thus free of oversubscribing the system up to any arbitrary level.

Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-12-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:46:42 +01:00
Dario Faggioli
2d3d891d33 sched/deadline: Add SCHED_DEADLINE inheritance logic
Some method to deal with rt-mutexes and make sched_dl interact with
the current PI-coded is needed, raising all but trivial issues, that
needs (according to us) to be solved with some restructuring of
the pi-code (i.e., going toward a proxy execution-ish implementation).

This is under development, in the meanwhile, as a temporary solution,
what this commits does is:

 - ensure a pi-lock owner with waiters is never throttled down. Instead,
   when it runs out of runtime, it immediately gets replenished and it's
   deadline is postponed;

 - the scheduling parameters (relative deadline and default runtime)
   used for that replenishments --during the whole period it holds the
   pi-lock-- are the ones of the waiting task with earliest deadline.

Acting this way, we provide some kind of boosting to the lock-owner,
still by using the existing (actually, slightly modified by the previous
commit) pi-architecture.

We would stress the fact that this is only a surely needed, all but
clean solution to the problem. In the end it's only a way to re-start
discussion within the community. So, as always, comments, ideas, rants,
etc.. are welcome! :-)

Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
[ Added !RT_MUTEXES build fix. ]
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-11-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:42:56 +01:00
Harald Gustafsson
755378a471 sched/deadline: Add period support for SCHED_DEADLINE tasks
Make it possible to specify a period (different or equal than
deadline) for -deadline tasks. Relative deadlines (D_i) are used on
task arrivals to generate new scheduling (absolute) deadlines as "d =
t + D_i", and periods (P_i) to postpone the scheduling deadlines as "d
= d + P_i" when the budget is zero.

This is in general useful to model (and schedule) tasks that have slow
activation rates (long periods), but have to be scheduled soon once
activated (short deadlines).

Signed-off-by: Harald Gustafsson <harald.gustafsson@ericsson.com>
Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-7-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:41:09 +01:00
Dario Faggioli
239be4a982 sched/deadline: Add SCHED_DEADLINE avg_update accounting
Make the core scheduler and load balancer aware of the load
produced by -deadline tasks, by updating the moving average
like for sched_rt.

Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-6-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:41:08 +01:00
Juri Lelli
1baca4ce16 sched/deadline: Add SCHED_DEADLINE SMP-related data structures & logic
Introduces data structures relevant for implementing dynamic
migration of -deadline tasks and the logic for checking if
runqueues are overloaded with -deadline tasks and for choosing
where a task should migrate, when it is the case.

Adds also dynamic migrations to SCHED_DEADLINE, so that tasks can
be moved among CPUs when necessary. It is also possible to bind a
task to a (set of) CPU(s), thus restricting its capability of
migrating, or forbidding migrations at all.

The very same approach used in sched_rt is utilised:
 - -deadline tasks are kept into CPU-specific runqueues,
 - -deadline tasks are migrated among runqueues to achieve the
   following:
    * on an M-CPU system the M earliest deadline ready tasks
      are always running;
    * affinity/cpusets settings of all the -deadline tasks is
      always respected.

Therefore, this very special form of "load balancing" is done with
an active method, i.e., the scheduler pushes or pulls tasks between
runqueues when they are woken up and/or (de)scheduled.
IOW, every time a preemption occurs, the descheduled task might be sent
to some other CPU (depending on its deadline) to continue executing
(push). On the other hand, every time a CPU becomes idle, it might pull
the second earliest deadline ready task from some other CPU.

To enforce this, a pull operation is always attempted before taking any
scheduling decision (pre_schedule()), as well as a push one after each
scheduling decision (post_schedule()). In addition, when a task arrives
or wakes up, the best CPU where to resume it is selected taking into
account its affinity mask, the system topology, but also its deadline.
E.g., from the scheduling point of view, the best CPU where to wake
up (and also where to push) a task is the one which is running the task
with the latest deadline among the M executing ones.

In order to facilitate these decisions, per-runqueue "caching" of the
deadlines of the currently running and of the first ready task is used.
Queued but not running tasks are also parked in another rb-tree to
speed-up pushes.

Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-5-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:41:07 +01:00
Dario Faggioli
aab03e05e8 sched/deadline: Add SCHED_DEADLINE structures & implementation
Introduces the data structures, constants and symbols needed for
SCHED_DEADLINE implementation.

Core data structure of SCHED_DEADLINE are defined, along with their
initializers. Hooks for checking if a task belong to the new policy
are also added where they are needed.

Adds a scheduling class, in sched/dl.c and a new policy called
SCHED_DEADLINE. It is an implementation of the Earliest Deadline
First (EDF) scheduling algorithm, augmented with a mechanism (called
Constant Bandwidth Server, CBS) that makes it possible to isolate
the behaviour of tasks between each other.

The typical -deadline task will be made up of a computation phase
(instance) which is activated on a periodic or sporadic fashion. The
expected (maximum) duration of such computation is called the task's
runtime; the time interval by which each instance need to be completed
is called the task's relative deadline. The task's absolute deadline
is dynamically calculated as the time instant a task (better, an
instance) activates plus the relative deadline.

The EDF algorithms selects the task with the smallest absolute
deadline as the one to be executed first, while the CBS ensures each
task to run for at most its runtime every (relative) deadline
length time interval, avoiding any interference between different
tasks (bandwidth isolation).
Thanks to this feature, also tasks that do not strictly comply with
the computational model sketched above can effectively use the new
policy.

To summarize, this patch:
 - introduces the data structures, constants and symbols needed;
 - implements the core logic of the scheduling algorithm in the new
   scheduling class file;
 - provides all the glue code between the new scheduling class and
   the core scheduler and refines the interactions between sched/dl
   and the other existing scheduling classes.

Signed-off-by: Dario Faggioli <raistlin@linux.it>
Signed-off-by: Michael Trimarchi <michael@amarulasolutions.com>
Signed-off-by: Fabio Checconi <fchecconi@gmail.com>
Signed-off-by: Juri Lelli <juri.lelli@gmail.com>
Signed-off-by: Peter Zijlstra <peterz@infradead.org>
Link: http://lkml.kernel.org/r/1383831828-15501-4-git-send-email-juri.lelli@gmail.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
2014-01-13 13:41:06 +01:00