task_work: add a scheduling point in task_work_run()

It seems commit 4a9d4b024a ("switch fput to task_work_add") re-
introduced the problem addressed in 944be0b224 ("close_files(): add
scheduling point")

If a server process with a lot of files (say 2 million tcp sockets) is
killed, we can spend a lot of time in task_work_run() and trigger a soft
lockup.

Signed-off-by: Eric Dumazet <edumazet@google.com>
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
This commit is contained in:
Eric Dumazet 2012-08-21 15:05:14 +02:00 committed by Linus Torvalds
parent ec5da7f8dc
commit f341861fb0

View File

@ -75,6 +75,7 @@ void task_work_run(void)
p = q->next;
q->func(q);
q = p;
cond_resched();
}
}
}